Introduction to 1964 Francis Barnett Project Episode 17
Let's dive into the details surrounding 1964 Francis Barnett Project Episode 17. time to fix, drill and Tap The chain adjuster Bracket and weld it back on the swinging arm, Mount and modify the Battery / Tool Box ...
1964 Francis Barnett Project Episode 17 Comprehensive Overview
Lots Of Little jobs, nuts and bolts, Chain adjusters, Basic ignition wiring, and new carb. Fitting parts to the The Engine rebuild starts, with limited knowledge and tools lets see how this goes.
Stripping Paint From Frame, Cleaning up Wheels.
Summary & Highlights for 1964 Francis Barnett Project Episode 17
- Cleaning Wheels Up. removing tyres from Wheels, Electrolysis, Striping and degreasing front forks.
- More Striping of Paint from front forks, headlight Bracket and the front mudguard.
- Stripping all parts from frame, de-greasing the parts to see what we have to work with.
- Painting Wheels, and other Parts, fitting fork legs to the
- Prepping main frame for paint, applying undercoat to main frame and side rails, let the painting begin.
That wraps up our extensive overview of 1964 Francis Barnett Project Episode 17.